Written quote
Price before work starts
Sink installation in Houston is the work of a drain, a trap and a supply connection, not just a basin in a hole. A new sink is a drain, a trap and a supply connection, not just a basin in a hole. El Primo Lalo Plumbing installs kitchen and bathroom sinks in Houston with the trap sloped right, the supply lines sound, and the shutoff valves working.
Every sink install covers the basics: removal, prep, setting the basin, connecting the drain and supply lines, and testing. Here's what's included, and what's an add-on if you want it.


We install kitchen and bathroom sinks in houses, condos, and townhomes across Houston. Every job includes a water test on the drain and supply lines before we leave.
Restaurants, offices, and retail spaces need sinks that pass inspection and hold up to daily use. We install commercial basins with the right air gaps and venting.
A sink install has three connections that all have to be right: the drain, the trap and the supply. The drain has to be vented and sloped, the trap has to hold water against sewer gas, and the supply lines and shutoff valves have to work. A failure in any one of them shows up as a slow drain, a smell, or water under the cabinet.
Kitchen remodels drive most sink installs in Houston, especially in older homes in the Heights and Montrose where kitchens are being renewed. A new sink is also the right time to replace old shutoff valves, which often do not shut off at all in older Houston homes, and to check the disposal connection in the kitchen.
Drain, trap, supply. Get all three right and the sink is done for years.
We keep the job simple: measure, protect, remove, install, test. Here's what you'll see from the moment we arrive to the final leak check.

Used to break loose the drain basket and supply connections under the sink, especially in tight cabinets where a standard wrench won't fit.

Cuts copper or PEX cleanly for supply line changes. A square cut is what keeps the compression fitting from leaking.

Connects copper or PEX without soldering. Useful in occupied homes where a propane torch isn't the best idea.

Used for copper supply line repairs where a soldered joint is the right call. We keep a fire blanket on hand for safety.

Clears a clogged trap or branch before the new sink goes in, so the drain flows from day one.

Checks the main line if multiple drains are slow. It tells us whether the problem is at the sink or further down the sewer.

Finds a hidden leak behind a wall or under a cabinet when the source isn't obvious from the visible connections.

We follow the 2021 UPC with Houston Amendments for drain slope, venting, and air gaps. That's what makes the install pass inspection and drain correctly.
We coordinate with the countertop crew to set the sink after the template is cut. The undermount brackets go in before the stone is set, so the sink is supported correctly. A clean install with no cracked edges and a sink that sits flush with the counter.
We remove the old vanity top and sink, check the shutoffs behind the panel, and install the new basin with new supply lines. The drain is tied into the existing rough-in. A finished vanity that drains right and doesn't leak into the unit below.
We quote the job, schedule a morning visit, and swap the sink and faucet in one trip. The old parts are hauled off so the unit is ready to show. The unit is rent-ready the same day, with a dry cabinet and working fixtures.
We cut the opening, run new supply lines from the nearest branch, and install the sink with a dedicated drain. The disposal goes in if the island has power. A second sink that works independently and doesn't slow the main sink drain.
Kitchen remodels in the Heights, Montrose and Memorial drive most installs, while bathroom sink installs follow bath refreshes city-wide. Old shutoff valves are the hidden job in older homes.
A 20-year-old drop-in sink had a crack at the drain and rust around the rim. The shutoff valves were frozen, and the cabinet floor had water stains.
We replaced the valves, installed a new undermount sink with a fresh drain basket, and sealed the cutout. The cabinet floor was dried and treated. The job took about four hours.
Wipe the sink dry after use and check under the cabinet once a month for moisture. A water softener will slow scale buildup on the faucet.
A condo owner wanted a new vanity top and sink. The old shutoffs were behind a panel and one was seized. The drain was slow.
We replaced the seized stop, cleared the trap, and installed the new sink with braided supply lines. The drain was tested and flowed freely. The job took three hours.
Run hot water down the drain weekly to keep the trap clear. Check the supply lines for drips after the first week.
The old disposal was jammed and the sink was leaking at the drain basket. The homeowner wanted a deeper basin and a new faucet.
We installed a new deeper sink, a new disposal, and a faucet with new supply lines. The drain was resealed and tested. The job took about five hours.
Run cold water while the disposal runs and avoid putting grease down the drain. Check the drain basket for looseness every few months.
Most sink calls come down to a handful of problems. Here's what we see and how we handle it.

We remove the old basin, check the cabinet floor for damage, and install a new sink with a fresh seal. If the cabinet floor is soft, we replace that section before the new sink goes in. A cracked sink can leak into the cabinet and rot the floor. Rust stains mean the enamel is gone and the metal is thinning.

We pull the drain, clean the opening, and reset it with fresh sealant and the right gasket. If the basket is cracked, we replace it. The drain gets a water test before we leave. A slow drip at the drain basket warps the cabinet base and can grow mold. It often looks fine until you pull everything out of the cabinet.

We replace the stops with new quarter-turn valves while the sink is out. It's a small add to the job that makes the next repair safe and quick. When a valve won't close, a simple repair turns into a flood. That's the moment most homeowners call us.

We set the new sink level with shims and check the drain slope before the sealant cures. A level sink drains fully and looks right. Water pools on one side and the drain doesn't fully empty. Over time, standing water stains the basin and breeds bacteria.
A drain basket torqued to spec and a fresh bead of silicone stop the slow drip that warps cabinet bases. We pressure-test the drain and supply connections before we pack up, so you're not finding a puddle under the sink two weeks later. Most jobs are dry on the first test.
Undermount sinks need a clean, supported cutout or the countertop edge can chip. We measure the template, check the cabinet rails, and add support brackets where the old install skipped them. That's the difference between a sink that lasts and one that sags.
Old shutoff valves seize, and braided lines fail at the crimp. On every new sink installation Houston job, we swap the stops and supply lines so the next repair is a five-minute job instead of a flood. It's cheap insurance while the cabinet is already open.
If you're adding a garbage disposal or a new faucet, we install it in the same visit. That means one trip, one set of connections, and a sink that's fully functional the day we leave. No waiting on a second crew to come back.
Clear records you can keep and share.
Price before work starts
Drain and supply checked
Old parts hauled off
The sink type and the shutoff valve condition are the two things that most affect the job. Knowing them before the visit keeps the quote accurate.
An undermount sink needs a clean cutout and support brackets. A drop-in sits on the counter and is faster to install.
Old valves often seize and need replacing. We check them before the sink goes in so the next repair is safe.
A sink that drains slowly may have a slope problem, not a clog. We check the drain slope during the install.

Outside these areas? Call and ask if we can reach you. (346) 776-8560
A plumber should install a sink, especially when the job involves new supply lines or a drain connection. The tie-in to the water supply and the drain is permanent work, and a bad connection leaks inside a cabinet where nobody sees it.
A straightforward swap is usually a short visit. The job takes longer when shutoff valves, supply lines or the drain also need work, which is common in older Houston homes. We give you a written scope before we start.
Yes, if they are old, corroded or do not shut off fully. A new sink on failed valves is a callback waiting to happen, and replacing the valves while the sink is out costs far less than a second visit.
Yes. Estimates are free, and you approve the written scope before work starts. We are open Monday to Sunday, 7:00 AM to 10:00 PM.
Call (346) 776-8560 for a free estimate. We set the drain and trap, connect the supply, and test the sink before we leave, Monday to Sunday, 7:00 AM to 10:00 PM.
Call us at (346) 776-8560 to book sink installation or ask a question. We are open Monday to Sunday, 7:00 AM to 10:00 PM, and estimates are free.
The fastest way to book is a phone call. Tell us what is happening and we will give you a free estimate and a time that works, Monday to Sunday, 7:00 AM to 10:00 PM.
Open Mon–Sun, 7:00 AM–10:00 PM. Free estimates.